Simulator

DEWA eligibility & ROI for your car park

A few inputs are enough for an order of magnitude. The final study will rely on your actual DEWA bills and account structure.

Your site

Default: 12.5 m² per bay.

Site typology

Indicative results

High potential

900 kWp

Estimated capacity

1,548 MWh

Annual output

618,890 AED

Annual savings

5.5 yrs

Payback

Coverable area
5,400 m²
Shaded bays
410
Self-consumed share
88 %
Bill coverage
20 %
Exportable surplus
186 MWh
Estimated investment
3,420,000 AED
Net gain over 25 years
12,052,260 AED
EV points prepared
30

Around 619 tonnes of CO₂ avoided per year.

Assumptions used

Yield 1720 kWh/kWp/yr · grid tariff 0.44 AED/kWh · surplus 0.105 AED/kWh (D33 ref.) · 6 m² per kWp · 72 % coverable area · CAPEX 3800 AED/kWp.

Exact savings, PV capacity, energy credits and EV options depend on the site and applicable DEWA approvals.

Get the ParkNova pre-study

We come back with a concept, an order of magnitude and the list of data to gather.