Simulator
DEWA eligibility & ROI for your car park
A few inputs are enough for an order of magnitude. The final study will rely on your actual DEWA bills and account structure.
Your site
Default: 12.5 m² per bay.
Site typology
Indicative results
High potential900 kWp
Estimated capacity
1,548 MWh
Annual output
618,890 AED
Annual savings
5.5 yrs
Payback
- Coverable area
- 5,400 m²
- Shaded bays
- 410
- Self-consumed share
- 88 %
- Bill coverage
- 20 %
- Exportable surplus
- 186 MWh
- Estimated investment
- 3,420,000 AED
- Net gain over 25 years
- 12,052,260 AED
- EV points prepared
- 30
Around 619 tonnes of CO₂ avoided per year.
Assumptions used
Yield 1720 kWh/kWp/yr · grid tariff 0.44 AED/kWh · surplus 0.105 AED/kWh (D33 ref.) · 6 m² per kWp · 72 % coverable area · CAPEX 3800 AED/kWp.
Exact savings, PV capacity, energy credits and EV options depend on the site and applicable DEWA approvals.
Get the ParkNova pre-study
We come back with a concept, an order of magnitude and the list of data to gather.